PAPER CUP MANUFACTURER IN ANHUI, CHINA

Manufacturing Capability Built for Reliable Repeat Orders

From material confirmation and printing to cup forming and export packing, we manage each production stage against approved order specifications.

Production line operation
52Production lines
Up to 150 millionCups monthly capacity
800–900 million/yearActual output in 2024 & 2025
Approx. 26,700 m²Factory site
20+ yearsManufacturing experience

FACTORY PRODUCTION VIDEO

See Paper Cup Manufacturing in Motion.

A real look at our forming lines, cup output, production equipment and material storage in Anhui, China.

Real factory footage · 30 secondsProduction line · cup forming · material storage

PRODUCTION WORKFLOW

A controlled route from order specification to packed cups.

Each order moves forward against confirmed product, printing and packing requirements.

01

Material & specification confirmation

Confirm cup structure, selected coating, quantity, artwork and packing requirements.

02

Flexographic or offset printing

Use the printing process confirmed for the selected material, artwork and order.

03

Die cutting & cup forming

Prepare the printed material and form cups to the approved product specification.

04

In-process inspection

Check appearance, rim, base and sealing during production.

05

Packing handover

Confirm bags, cartons, labels and carton marks before the order moves to loading planning.

PRODUCTION FLOOR

Real equipment. Real production conditions.

Current factory photographs show cup forming, line coordination and packing activity. Printing imagery will be added after the new factory shoot.

Cup forming equipment

Cup forming equipment

Close-up of a cup forming station during production.

Production line operation

Production line operation

Paper cups moving through the forming process.

Packing handover

Packing handover

Finished production moving into carton and packing preparation.

PRODUCTION CONTROL

Consistency starts with the approved order.

Manufacturing controls focus on the details that affect repeat orders. Full compliance and quality information remains available on the dedicated quality page.

Explore Quality Control
Approved specificationsProduct structure, quantity and packing requirements confirmed before scheduling.
Printing referencesApproved artwork and color references carried into production.
Cup forming checksRim, base, sealing and finished appearance reviewed during forming.
Packing confirmationBags, cartons, labels and carton marks checked against order requirements.

FOR IMPORT BUYERS

Production planning connected to export delivery.

Production timing is confirmed after artwork approval according to product, quantity and factory scheduling. Eligible products and sizes can be coordinated for mixed-order planning.

View Shipping & Mixed Loading
Conditional production scheduling
Mixed eligible product planning
Packing and carton-mark confirmation
Handover to container planning

FACTORY GALLERY

Inside our Anhui manufacturing site.

MANUFACTURING FAQ

Answers for production planning.

How many production lines does EcoWing operate?

EcoWing operates 52 production lines at its paper cup manufacturing site in Anhui, China.

What is your monthly production capacity?

Monthly production capacity is up to 150 million paper cups. Actual annual output was approximately 800–900 million cups in both 2024 and 2025; current output and scheduling depend on the selected products and production plan.

Do you support OEM custom printed paper cups?

Yes. We support customer artwork, complimentary layout assistance, and flexographic or offset printing according to the selected order.

Which printing methods are available?

Flexographic and offset printing are available. The appropriate method is confirmed according to cup structure, material, artwork and order quantity.

How is production lead time confirmed?

Lead time is confirmed after artwork approval according to product specifications, quantity, production scheduling and destination requirements.

Can different cup sizes be combined in one order?

Eligible products and sizes can be coordinated for mixed-order planning. The final combination and MOQ are confirmed during quotation.

Planning a repeat or high-volume paper cup order?

Request a Factory Quote